 |
|
|
04-04-071R | Phase 3 Proposal:LIBS Module for Dolomite Content Evaluation on Conveyer, Dr. Michael Gaft - ITL Inc.
| 05/27/2005 |
04-04-070 | Characterization of Phosphate Slurries for Pump Effects and Pipe Effects, University of Florida
| 09/12/2004 |
04-04-069S | Centrifugal Slurry Pump Concentration Limit Testing and Evaluation, Addie, Graeme R. - GIW Industries Inc.
| 04/17/2006 |
01-04-067 | Development of LIBS Module for Dolomite Concentration Evaluation in Phosphates, International Technologies
| 02/01/2003 |
99-04-065R | Laser-Induced Time-Resolved Luminescence Evaluation of Phosphates with High Dolomite Content, IMC-Agrico Company
| 01/01/2000 |
99-04-063 | Modification of Phospholyzer On-line BPL Analyzer Owned by the Institute of Phosphate Research to Measure Slurry Percent Solids with Conductivity Sensor, Harrison R. Cooper Systems Inc.
| 12/01/1999 |
98-04-059 | Rheological Evaluation and Control of Flow Behavior of Concentrated Phosphate Mineral Slurries, University of Florida
| 10/19/1998 |
97-04-058 | Matrix Pump Performance Evaluation While Cavitating, GIW Industries, Inc.
| 09/01/1997 |
96-04-057R | Laser Induced Breakdown Spectroscopy for Elemental Process Monitoring of Slurry Streams, University of Florida
| 04/21/1997 |
96-04-056R | Development of an On-Line Concentration Sensor for Slurry Flow Through Large Diameter Pipes, University of Florida
| 04/21/1997 |
95-04-055 | Crust Formation and Desiccation Characteristics for Phosphatic Clays, University of Colorado
| 04/19/1996 |
95-04-054 | Simulation Model of Phosphate Rail System and Operations - Phase III, PMR, Inc.
| 05/15/1996 |
94-04-053 | Simulation Model of Phosphate Rail System and Operations - Phase II, PMR, Inc.
| 05/16/1994 |
93-04-052R | Minimizing Drill Costs of Phosphate Reserve Estimation, David Rosenberg
| 09/13/1993 |
93-04-051R | Evaluation of the Mintek On-Stream X-ray Diffraction System for Mineral Composition Analysis in the Phosphate Industry, IMC-Agrico Company
| 05/02/1994 |
92-04-049 | Simulation Model of Phosphate Rail Systems and Operations, PMR, Inc.
| 02/11/1993 |
92-04-048 | Phosphate Land Reclamation,a Student's Introduction, Mulberry Phosphate Museum
| 12/02/1992 |
91-04-047 | Technology Transfer Fourth Program, FIPR In-House
| 01/06/1992 |
90-04-045 | An Optical Sensor for On-Line Analysis of Phosphate Minerals, VPI & SU
| 05/01/1991 |
88-04-044 | Development of a Positive Feed System for Matrix Pipeline Transportation System, GIW
| 09/15/1990 |
88-04-043 | Land Data Need Evaluation for FIPR Research Community, Dale Friedley
| 07/19/1988 |
88-04-042R | Technology Transfer 3rd Program , FIPR In-House
| 11/01/1988 |
88-04-041 | Regional Study of Land Use Planning and Reclamation, (CFRPC
| 06/08/1988 |
87-04-039 | Habitat Use and Behavior of Wading Birds Nesting at Lake Hancock, Polk Co. Florida, UF
| 12/15/1987 |
87-04-037R | Phosphate Matrix Pipeline Design and Data Tools for Efficiency Improvement, GIW Hydraulic Lab
| 08/27/1987 |
86-04-036 | Technology Transfer - 2nd Program, FIPR In-House
| 03/15/1987 |
86-04-035 | AIME - 1987 Regional Conference,
| 01/09/1987 |
86-04-034 | Lake Hancock Mining and Reclamation Study, Zellars-Williams Co.
| 08/29/1986 |
86-04-032 | An Investigation of Potential for Improved Efficiencies in Phosphate Rougher Flotation through On-line BPL Measurement, Harrison Cooper Systems
| 11/17/1986 |
86-04-031 | An Assessment of Present Phosphate Mining and Beneficiation Practice and the Evaluation of Alternative Technology, Zellars-Williams Co.
| 05/01/1987 |
86-04-030R | Tailings Transport Improvement, (WACCO, Inc./L.P.S., Inc.
| 09/16/1986 |
85-04-028 | Technology Transfer - Short Course Program, FIPR In-House
| 10/01/1985 |
83-04-017 | Inventory and Presentation of Environmental Quality Monitoring Locations in the Central Fla. Phosphate Dist., Seaburn & Robertson
| 01/03/1984 |
82-04-013 | Ground Penetrating Radar System for Detecting Sub-surface Anomalies, Bureau of Mines
| 10/10/1983 |
81-04-010 | Articulated Cutterhead Ladder for Phosphate Pit Car Operation, Circle J Dredging Corp.
| 04/29/1982 |